Skip to content
Menu
Home
About Us
Company History
SHEQ
What we do
Directional Drilling
Drilling Process
Maxi Rigs
Midi Rigs
Mini Rigs
Pit Launch
Mud Recycling
HDD Equipment Hire and Sales
Guided Auger Boring
Guided Auger Boring Technique or Auger Boring Method
Guided auger boring machines for Hire or Sale
Pipe Ramming
Mud Pump Hire
Case Studies
Directional Drilling
Bundoran Waste water Treatment Works – Long Sea Outfall
Offshore Windfarm Cable Ducts
Outfall Case Study – Loch Ryan WwTW
High Pressure Gas Pipeline HDD Case Study – River Eden
River Medina Sewer Replacement
Turnford Railway Crossing
Pit Launch HDD Case Study
River Tyne Crossing
Selby Rail and River crossing
River Tees Crossing
132kV Cable Circuits, Sizewell B Power Station
HDD Case Study – Franklaw to Barnacre Water Main Improvement
Guided Auger Boring
Auger Boring – Rail Crossing, North Lincolnshire
Pipe Ramming
Pipe Ram – October 2018
Pipe Ram for HDD Casing
UTX Pipe Ram
Outfall Pipe Ram
News
Vacancies
Contact
01724 294 294
Close Menu
Image and Video Gallery
Rock Drilling and Pipe Pushing on the West Coast of Ireland with AMS No-Dig’s Prime Drilling PD250
AMS No-Dig's Prime Drilling PD60
Reamer and pipe
PD250
PD250
Pulling pipe into Directional Drilling bore
Barrel reamer
AMS No-Dig PD250
Reamer attached ready to pull pipe
Pipe being pulled following Directional Drilling
Pulling head and reamer with Pipe attached
Pulling pipe into Directional Drilling bore
Pulling pipe into Directional Drilling bore
AMS No-Dig PD250
AMS No-Dig PD250
Directional Drilling control cabin for the PD250
AMS No-Dig PD250
Typical Directional Drilling Site Setup
AMS No-Dig PD250
DCIM101MEDIA